Contents
1 General Provisions
2 Basic Provisions
2.1 Exploitation Ambit
2.2 Resources/Reserves
2.3 Design Production Capacity
2.4 Transportation Mode Development and Procedure Exploitation
3 Exploitation Process
3.1 General Requirements
3.2 Intermittent Exploitation Process
3.3 Continuous Exploitation Process
3.4 Hemicontinuous Exploitation Process
3.5 Open Casting Exploitation Process
3.6 Other Exploitation Processes
3.7 Perforation Blasting
4 Internal Transportation
4.1 General Requirements
4.2 Truck Transportation
4.3 Belt Conveyor Transportation;
4.4 Railway Transportation
5 Dumping site
5.1 General Requirements
5.2 Specification of Dumping Line
5.3 Dumping Mode and Equipment Selection
6 Slope Stability Engineering
7 Groundwater Control
7.1 General Requirements
7.2 Groundwater Control Methods
7.3 Hydrologic Geology Calculation
7.4 Equipment and Ancillary Facilities
7.5 Filter
8 Waterproofing and Drainage
8.1 Drainage of Excavation Field
8.2 Ground Anti-drainage
9 Production System
9.1 Production Capacity
9.2 Crushing
9.3 Coal Storage
9.4 Loading
10 General layout plans of industrial site
10.1 Site Selection
10.2 General Layout Plans
10.3 Perpendicular Layout as well as the Waterproof and Drainage of Site
10.4 Site Road
11 Electromechanical Devices Maintenance
11.1 General Requirements
11.2 Mechanical Equipment Maintenance
11.3 Electrical Equipment Maintenance
11.4 Storehouse
12 Electricity
12.1 Power Supply and Substation
12.2 Distribution of Excavation Field and Dumping Site
12.3 Dewatering and Power Distribution
12.4 Power Distribution of Production System and Ancillary Facilities
12.5 Electric Traction Power Supply
12.6 Lightning Protection and Earthing
12.7 Railway Signal
13 Communication
13.1 General Requirements
13.2 Communication of Production Scheduling
13.3 Administrative Management Communication
13.4 Cable Television System
13.5 Communication Line
14 Centralized Control as well as Monitor and Computer Management
14.1 General Requirements
14.2 Centralized Controlling and Monitoring
14.3 Computer Management
15 Ground Construction, Water Supply and Drainage as well as Heating and Ventilation
15.1 General Requirements of Ground Construction
15.2 Crushing Station
15.3 Nose Station (driving station, reload station) and Distribution Station
15.4 Belt Convey Trestle or Underground
15.5 Coal Yard of Run-of-mine Coal
15.6 Administration and Public Constructions
15.7 Water Source
15.8 Water Supply
15.9 Fire Fighting, Pipelines and Devices
15.10 Drainage
15.11 Heating
15.12 Ventilation
15.13 Heating
16 Environmental Protection
16.1 General Requirements
16.2 Pollution Prevention
16.3 Land Reclamation as well as Water and Soil Conservation
16.4 Organization Structuring and Investing
17 Technical Economy
17.1 General Requirements
17.2 Labor Requirement and Labor Productivity
17.3 Investment Estimation and Budget Estimation
17.4 Technical and Economic Evaluation
17.5 Comprehensive Evaluation of the Technical Economy
Annex A Classification of Solid Mineral Resources/reserves
Annex B Estimation Indices of Coal Resources
Annex C Classification and Calculation of Resources/Reserves in the Pre-feasibility Study Feasibility Study and Preliminary Design
C.1 Classification and Calculation of the Resources/reserves in the Pre-feasibility Study (I)
C.2 Classification and Calculation of the Resources/reserves in the Pre-feasibility Study (II)
C.3 Classification and Calculation of Resources/reserves in the Feasibility Study and Preliminary Design
Explanation of Wording in this Code
1 General Provisions
1.0.1 This code was formulated in order to implement each law and regulation and policy of national development coal industry, promote and apply tried and true advanced technology and management experience of open pit mine, promote the scientific and technical progress, maintain the sustainable development of coal industry, improve the economic benefit of open pit mine, and achieve safety production and rational exploitation of coal resources.
1.0.2 This code is applicable to the pre-feasibility study, feasibility study and engineering design for the construction, renovation and extension of large and medium open pit mines. The pre-feasibility study, feasibility study and engineering design of small open pit mines may be carried out referring to this code.
1.0.3 For the constituent of open pit mine construction engineering project, the major works shall be the first and the principles of coordination based on specialization and socialization service shall be insisted.
1.0.4 For the engineering design of open pit mine, the economic benefit shall be the focus, and the sustainable development principle shall be put into effect, the high-yield and high-efficiency are the target, modern technical equipments shall be adopted, the informatization management shall be carried out and the policy of centralized production and environment burden reduce shall be put into effect. The engineering relation between short-term and long-term and short-term as the first shall be treated well.