出版社: 中国电力出版社
出版日期: 2009-12-01
本标准规定了火力发电建设工程机组启动试运及验收等工作的基本要求。
本标准适用于单机容量为3O0MW及以上的各 新建、扩建、改建的火力发电建设工程。
单机容量为300MW以下的火力发电建设工程可参照本标准执行。
Contents
Foreword
1 Scope
2 General Provisions
3 Unit Commissioning and Handover Acceptance
3.1 General Principles
3.2 Organization and Responsibility Division of Unit Commissioning
3.3 Subdivision Commissioning Phase
3.4 Whole-set Start-up Commissioning Phase
3.5 Handover and Acceptance of Unit
3.6 Statement of Exceptional Circumstances
4 Assessment Period of Unit
5 Completed Acceptance of Project
Annex A (Informative) Inspection and Confirmation Table of the Conditions for Every Commissioning Phase
Annex B (Informative) Handover Signature Card of Generation Custody for Device or System
Annex C (Informative) Handover Report of Unit Transferring Production
1 Scope
This standard specifies the basic requirements of fossil power construction project from the unit commissioning to completed acceptance.
This standard is applicable to these constructed, extended and renovated fossil power construction projects with unit capacity of or above 300MW.
The fossil power construction project with unit capacity under 300MW may be implemented by making reference thereto.